Home Page | The House | Work in Progress | Archive |Planning Applications | The Area | Contact
Week 19
The Bathroom Floor

At last we've got our first concrete floor down. This was definitely the hardest because of the drain pipes. The concrete was laid on a bed of sand, plastic membrane and finally shocking pink polystyrene insulation slabs. We used bricks and mortar to create a number of floor level guides.

The Kitchen Floor

This is ready for concreting tomorrow. It was a lot easier than the bathroom though there was a lot more electric conduit to lay.